BMO Harris Bank Maintenance

Goal: For Icon engineers to create inspection instructions based on a number of high rise sign projects completed previously.

Scope of Work: Damage to a high-rise letter set created the need for BMO to inspect every sign installed over 3 stories above grade.

Results: Icon Engineers created inspection instructions based on a number of high-rise sign project completed previously. Inspection guidelines and checklists were sent to only qualified highrise sign installation specialists who would inspect the sign, mounting points and structure to ensure integrity. Each insection required a completed checklist which was sent to BMO and JLL for future reference and inspections.